Fastest Business Solutions With
Smart Meter Installation
Streamline your registration process effortlessly with Samar Infotech Solutions—ensuring a seamless and straight forward experience for your users.
[contact-form-7 id=”149e7a1″ title=”Request Quote Form”]
-
To replace/install meters from the list provided by the client -
Arrange all necessary tool kit required on field -
Provide manpower/Electrician for the Assignment -
To arrange all safety kit for electrician as per protoco -
To Maintain inventory and report on daily basis -
Submit all old meter to ware house without failure and within meline -
Any new/old material missing will be penalized APA
-
Team of 10 helpers and 10 Electricians is mandatory. -
Each team should have one electronics or mobile device, with the following configuration to carry out the consumer indexing and update the required data on work force management system of EDF IN:
-
RAM: – At least 4 GB or more – To handle large number of data and big files. -
Internal Storage – 32 GB and should have good storage to support offline mode and large volume of data/files (images, pdf, videos etc.) -
Resolution – minimum 720×1281 -
Screen size :- 5.5 inch recommended (minimum 5.0 inch user choice) -
Android OS: – minimum 5.0.
Each smart meter installation team should have the following minimum tools:-
-
Battery operated drilling machine only; -
Electrical meter/Test lamp; o Electrical tool kit set with bag; -
Battery bank of minimum size 20000 mAH; -
Portable electrical inverter with battery, with an objective to continue meter installation activities, even in scenario of no electricity on electrical network of DISCOM; -
Crimping tool.
Unit price Schedule For Execution Work
S.No. | Description | Rate |
The price includes consumer indexing, site survey, meter installation, ancillary work like removal of old meter and fixing of smart meters | ||
1 | Price for meter installation, including Consumer Indexing / Site survey – Single Phases | As per the State |
Note:- The rates for Survey, Consumer Indexing, Installation of Smart Meters are exclusive of all applicable taxes except Goods and Service Tax (GST).
Smart Meter Installation Project
Documents Required
-
GST -
Aadhar Card -
PAN Card -
Firm Cancel Cheque -
Security Cheque -
Mobile Number -
Mail ID, and -
Letterhead with Stamp & Signature
Payout:- As per BOQ which will be different for all district so shall be attached and signed accordingly.
Pay Cycle:- 90% payment of the invoice shall be done within 25 (twenty-five) working days from the date of receiving the invoice.
Note:-The 10% retained will be released full reconcilia on the installed smart meters, but no later than 90 days.
Kits And Tools Required | |
Tools Name | Safety PPEs |
Taparia Player | Safety Helmet |
Tapariya Cutter | Reflective Jacket Rod |
LT Line Tester | PVC Hand gloves |
Tapriye Screw Driver Set | Safety Shoes |
Portable Hammer (Wodden handle) | Nose Mask |
Portable Crimping Tools | Hand Sanitizer |
Red, yellow, Blue & Black PVC Tape | First Aid Box |
Portable Drill Machine | |
Small Saw | |
PVC Screw bit | |
Portable Extension Box |
Enquiry now
Smart Meter Installation Project
Project Gallery
- Smart Meter Installation
- Solar Project
Real Client Stories
Customer Experiences
Sara Albert
Web Designer
Expert guidance helped us make smarter decisions and drive growth. Excellent service!
James Millard
Ui/Ux Designer
Expert guidance helped us make smarter decisions and drive growth. Thank you!
Richerd William
Developer
Delivered beyond expectations. A trusted advisor who gets results. Highly recommend!